Concrete being poured for Sanctuary stairs.

View of "double" permanent wall, as seen from inside the Sanctuary: Thus two walls, flush to one another essentially, one wall being the outer perimeter of the Sanctuary and one being the outer perimeter of the MPR. That double panel-wall scenario will replicate all along the corridor of the Sanctuary, as it gets closed in.

View of putting in place one of a series of 400lb beams, to which these panel walls will be attached, as will the roof as well.

Perhaps coolest of all; concrete being poured for the upper parking lot curb-cuts. You can really now "see" the configuration of the upper lot.

 